in this Project my rule is Head of the technical office and my Tasks and Achievements as:
*Design and calculation of the Excavation structure of the type of Braced Cut and anchorage in the -23 meter Excavation
*Project control and work scheduling
*meter and estimation of materials and manpower
*Welding control and workshop reports
*Optimizing the design using ST52 sections and Reduce 40% Weight of Structure
Implementation of flange connection in middle struts Dealing with the status of contractors
In the design of Braced Cut system, the following items are checked and then according to the mentioned items, the required type of system and sections are selected and designed. These include:
Geotechnical studies of the project (layering and selection of physical and mechanical parameters of each layer)
Groundwater conditions
Determining Live loads (material depot and workshop equipment, etc.) or Dead loads (buildings, etc.) adjacent the pit
Determining the depth of the pit walls based on the topographic conditions and the foundation level of adjacent buildings
Evaluation of adjacent structure sensitivity to the amount of deformation
Component arrangement of the Braced Cut system, considering guard structure and main structure interferences and the maneuverability of the machines
Type the design based on the above six items
Selecting appropriate geotechnical and structural software for modeling
Review and select related Code
Economic considerations
Comments