I was present as a workshop manager in this project. The final status of the project was 1.000.000$ This project was designed to implement the infrastructure of the fire pipeline and fire alarm system. Project Summary: Sea water is sucked from the sea by a pump and transferred into underground pipes and finally directed to hydrants and fire boxes. Because we wanted to use sea water, we had to build a utility dock on the water at a distance of 20 meters from the land. Due to the volume of sea water and the long distance from the pump suction site as well as the …

Read More

In this project my role is Project Control Manager & Steel Piperack Designer. contract amount about one millions Dollar – 1.000.000$. the firs I Planning the Project by MSP (Microsoft Project) and estimate Duration, Cost & Resource to Project implementation. This Project given to office by tender and we won in Tender Because of the Technically and Lowest price. Project have 3 Phase: in Phase 1 we should implementation of GRVE Pipe Line for fire extinguisher system, also before implementation of GRVE Pipe Line we must Design and Construct Steel Pipe Rack to Passing pipe Line. Pipe rack have Column and Beam like Steel Structure …

Read More